We liase with the client, engineer and/or council to ensure all processes are followed to achieve the desired specifications. From house floors to yard slabs, we'll do it all. Below are some examples of previous projects.
Yard slab for cold-store
600m2, 150mm thick U3 machine finished slab for a coolstore in Pakowhai, Hastings.
Vehicle entrance for animal housing
220m2, 150mm thick U3 machine finished pad for a vehicle entrance at Bostock Brothers, Hastings.
Truck wash pad
For Everfresh Transport in Hastings. 220m2, 150mm thick U3 machine finished for hosing down vehicles.
Shed pad
750m2 Chicken-shed pad for Bostock Brothers in Hastings.
House slab
180m2 House slab for Total Homes. This is part of a Kainga Ora project.
JOAL - Shared driveway
440m2 at 150mm deep. Council and engineer inspected prior to pouring.
Vehicle crossing
Standard crossing carried out in Napier. 150mm thick and broom finished.
Truck entrance
Another heaving truck entrance for Bostock Brothers.